Maintenance for the week of January 5:
· [IN PROGRESS] NA megaservers for maintenance – January 7, 4:00AM EST (9:00 UTC) - 10:00AM EST (15:00 UTC)
· [IN PROGRESS] EU megaservers for maintenance – January 7, 4:00AM EST (9:00 UTC) - 10:00AM EST (15:00 UTC)

ESO Live Episode 31 Full (aired 01/15/2016)

Morostyle
Morostyle
✭✭✭✭
25min in the video = PVP updates...... (T_T) Share you're thoughts


https://www.youtube.com/watch?v=Q8m14tUK43U
Edited by Morostyle on January 15, 2016 10:39PM
  • Soulac
    Soulac
    ✭✭✭✭✭
    ✭✭
    Summed up:
    No eta
    In the future
    Don't know
    Can't tell
    Soon tm
    R.I.P Dawnbreaker / Auriel´s Bow
    Member of the Arena Guild and the overpowered Banana Squad.
    Nathaerizh aka Cat - Nightblade V16 - EU

    - Meow -
  • OdinForge
    OdinForge
    ✭✭✭✭✭
    ✭✭
    I'm at a loss of what to say, I can't wait anymore.

    Especially with games like Dark Souls 3 and For Honor launching in 2016.
    The Age of Wrobel.
  • Morostyle
    Morostyle
    ✭✭✭✭
    Im leaving ESO as soon as BDO launches - followed up by CU. I was hoping the patch would bring back PVP to life...
  • bikerangelo
    bikerangelo
    ✭✭✭✭✭
    Soulac wrote: »
    Summed up:
    No eta
    In the future
    Don't know
    Can't tell
    Soon tm

    Careful, they might lock the thread if you say stuff like that. As soon as For Honor comes out, I'm done with ESO.
  • Jhunn
    Jhunn
    ✭✭✭✭✭
    Wasn't able to see it live so thanks for posting this Moro. Just watched the PvP 'section' (can hardly call it a section). Don't know why I'm dissapointed, I should know better than expecting something positive.

    It's a bit embarrasing, both me expecting something and this shows 'news and updates'.
    Edited by Jhunn on January 15, 2016 11:21PM
    Gave up.
  • Uberkull
    Uberkull
    ✭✭✭✭✭
    Duct tape and Glue.

    That pretty much sums up current pvp and any hopes for new pvp modes for 2016. Bye bye pvp community.
    ▬ஜ Seeds of War, Piles of Skulls ஜ▬
    ▬▬▬ஜ twitch.tv/uberkull ஜ▬▬▬
  • frozywozy
    frozywozy
    ✭✭✭✭✭
    ✭✭
    @ZOS_BrianWheeler mentioned that they're looking into certain abilities and changing their interaction with the server to help decrease the stress level. They should invert the responsiveness of Steel Tornado and CC breaking. :)
    Edited by frozywozy on January 16, 2016 12:03AM
    Frozn - Stamdk - AR50
    Frosted - Magplar - AR50
    Frodn - Magden - AR50
    Warmed - Magblade - AR50
    Mmfrozy - Magsorc - AR44
    Necrozn - Magcro - AR32
    Twitch.TV/FrozyTV
    PvP Group Builds

    “Small minds discuss people, average minds discuss events, and great minds discuss ideas.” -Eleanor Roosevelt
    • Fix Volendrung (spawn location - weapon white on the map causing the wielder to keep it forever - usable with emperorship)
    • Remove / Change CPs System, remove current CP/noCP campaigns and introduce one 30days with lock, one with no locks
    • Fix crashes when approaching a keep under attack because of bad / wrong rendering prioritization system
    • Change emperorship to value faction score points and not alliance points - see this and this
    • Fix long loading screens (mostly caused by players joining group out of rendering range)
    • Add 2 more quickslots to the wheel or add a different wheel for sieges weaponry only
    • Fix Balista Bolts not dealing damage on walls or doors if deployed at a certain place
    • Release bigger battlegrounds with 8 to 16 players per team and only two teams
    • Fix the permanent block animation - see examples : link1 link2 link3 link4 link5
    • Gives players 10 minutes to get back into Cyrodiil after relogging / crashing
    • Add a function to ignore the Claiming system of useless rewards
    • Improve the Mailing System / Rewards of the Worthy stacking
    • Assign specific group sizes to specific campaigns (24-16-8)
    • Make forward camps impossible to place near objectives
    • Make snares only available from ground effects abilities
    • Change emperorship to last minimum 24hours
    • Fix body sliding after cc breaking too quickly
    • Remove Block Casting through Battle Spirit
    • Fix the speed drop while jumping - see video
    • Fix loading screens when keeps upgrade
    • Fix Rams going crazy (spinning around)
    • Bring back dynamic ulti regeneration
    • Fix speed bug (abilities locked)
    • Introduce dynamic population
    • Lower population cap by 20%
    • Add Snare Immunity potions
    • Bring resurrection sickness
    • Fix character desync
    • Fix cc breaking bug
    • Fix gap closer bug
    • Fix health desync
    • Fix combat bug
    • Fix streak bug
    • Fix server lag
  • KenaPKK
    KenaPKK
    ✭✭✭✭✭
    ✭✭
    A very disappointing report from ZoS... @ZOS_BrianWheeler you don't seem to realize how dire your situation is.
    Edited by KenaPKK on January 16, 2016 12:26AM
    Kena
    Former Class Rep
    Former Legend GM
    Theorycrafter
    Beta player

    youtube.com/@KenaPKK (inactive)
  • Alucardo
    Alucardo
    ✭✭✭✭✭
    ✭✭✭✭✭
    N2giD6X.png
  • VincentBlanquin
    VincentBlanquin
    ✭✭✭
    so we will probably get district and cities capturing in 2016 and obviously small scale - arenas battlegrounds and dueling in 2017 if even. lets make a year vacation guys
    Edited by VincentBlanquin on January 16, 2016 12:44AM
    Irwen Vincinter - Nord - Dragonknight
    Irw´en - Bosmer - Nightblade
  • Karamis_Vimardon
    Karamis_Vimardon
    ✭✭✭✭
    so we will probably get district and cities capturing in 2016 and obviously small scale - arenas battlegrounds and dueling in 2017 if even. lets make a year vacation guys

    LOL too many players will have gone to Camelot Unchained, Black Desert Online, For Honor, and Star Citizen by even Q3 this year for it to matter
    PC NA

    Karamis Vimardon, DC Templar (Magplar)
    Netara, DC Nightblade (Stamblade)
    Karamis, DC Sorc (Magicka)
    Hãderus, EP Templar (Healbot)
    Mr Twinkle-Toes, DC DK (Tank)

    game
    noun: game;
    plural noun: games
    1. a form of competitive activity or sport played according to rules.
    2. an activity that one engages in for amusement.
  • Amica
    Amica
    ✭✭✭
    Yeah i'm with many of the other posters o this one. You left it too late, your great year you claim to of had in 2015. You should of focused on how to keep said players in 2016 and 2017.
    Truth is and i think some people will agree with me on this. It will take some serious fixes and changes in the first half of the year, to even make some people think about continuing to give Zos the benefit of the doubt and stick around. But i personally think that they may have screwed it up for themselves already. Any game store you go to, you will see STACKS of pre owned ESO's for sale.

    "To little to late guys" Sad ESO really does have potential, but most of us are not going to wait for you to MAYBE find your greatness.

    also 26 min in .... anyone get that drop in the pit of their stomach and the thought client side come to mind? *SHUDDERS*
    Edited by Amica on January 16, 2016 7:45AM
    NB Shashu of DC
    DK William x Wallace of DC
    In game @Amica.
    "i Thought i was poor having no shoe's, Until i saw a man with no feet"
  • RoamingRiverElk
    RoamingRiverElk
    ✭✭✭✭✭
    Wrobel wasn't even in the show. Nor did Wheeler talk about the siege changes in any detail.
    Dalris Aalr - Magicka (Stamina) DK | Dalfish - Magicka Sorc | Dal Aalr - Magicka Warden | Dalrish - Mag/Stam NB | Irana Aalr - PvE Templar
  • Mojmir
    Mojmir
    ✭✭✭✭✭
    ✭✭✭✭✭
    Good thing I got my kids what they wanted for Christmas,not this bs
  • Alucardo
    Alucardo
    ✭✭✭✭✭
    ✭✭✭✭✭
    Wrobel wasn't even in the show. Nor did Wheeler talk about the siege changes in any detail.

    At least Wheeler has given us plenty of information on the future of PVP, which is more than could be said about Wrobel and class balance.
  • Alcast
    Alcast
    Class Representative
    xfatx.jpg
    https://alcasthq.com - Alcasthq.com Builds & Guides
    https://eso-hub.com - ESO-Hub.com Sets, Skills, Guides & News
    https://dwemerautomaton.com - Discord, Telegram & Twitch Command Bot



  • MormondPayne_EP
    MormondPayne_EP
    ✭✭✭✭
    NO ETA


    This is a sick [snip] joke...


    [Moderator Note: Edited per our rules on Spamming, Cursing & Profanity]
    Edited by ZOS_KaeylaW on January 17, 2016 1:43AM
  • VincentBlanquin
    VincentBlanquin
    ✭✭✭
    so we will probably get district and cities capturing in 2016 and obviously small scale - arenas battlegrounds and dueling in 2017 if even. lets make a year vacation guys

    LOL too many players will have gone to Camelot Unchained, Black Desert Online, For Honor, and Star Citizen by even Q3 this year for it to matter

    my statements is there is nowhere to go and majority will see crisis of genre and majority will be here year later to see how gooes instanced pvp in eso. mark my words

    Irwen Vincinter - Nord - Dragonknight
    Irw´en - Bosmer - Nightblade
  • Yolokin_Swagonborn
    Yolokin_Swagonborn
    ✭✭✭✭✭
    ✭✭✭✭✭
    Edited by Yolokin_Swagonborn on January 16, 2016 8:35PM
  • themdogesbite
    themdogesbite
    ✭✭✭✭✭
    Atleast we aren't suprised anymore, posetive thinking friends.
    :]
  • Morostyle
    Morostyle
    ✭✭✭✭
  • ThyIronFist
    ThyIronFist
    ✭✭✭✭✭
    Q7uJP0T.jpg
    The Elder Zergs Online
    Sainur Ironfist - DK - EU - Ebonheart Pact
    Retired
  • Manoekin
    Manoekin
    ✭✭✭✭✭
    ✭✭
  • Keiryan
    Keiryan
    ✭✭✭

    Bwahaha..

    It's like I said in another post, I honestly feel like I'm begging ZoS, who's sitting in the front driving the short-bus, not to kick me off and let me stay with my friends every time I log in.
    Edited by Keiryan on January 16, 2016 5:40PM
    Keiryan / Yuluka / Keir Jong-Un
    Glorious Leader of North DC and The K-Hole
  • Minno
    Minno
    ✭✭✭✭✭
    ✭✭✭✭✭
    No ETA. What happens if i had a client ask me "what's the ETA for those submittals?"
    In construction, submittals are documents used to solidify purchases on a project, according to our contract/design documents. Sometimes the person building the project or person supplying (distributor) holds on to these things for a month. Guess what, client still expects them to be signed off and reviewed according to the schedule/design all the trades aggreed to.
    Guess what else? You get that client his stuff that day so he is set in his mind your the man/woman that gets things done. That's how you protect good client business relationships.

    Sample of a construction schedule:
    fast-easy-accounting-bookkeeping-services-ms-project-gantt-chart-example.png?t=1452713886224&width=570&height=300
    Miss any of these deadlines and it costs the client money. If there's a problem, you have a week to solve it unless it's decided as an addendum (which costs money).

    Guess how you look good solving these things but need cushion room? Tell us it will be ready for next update, but solve it in a week and issue it.

    ZOS needs to up their post-release game if it wants to keep making MMO games.

    Minno - DC - Forum-plar Extraordinaire
    - Guild-lead for MV
    - Filthy Casual
  • Wollust
    Wollust
    ✭✭✭✭✭
    ✭✭✭✭
    Morostyle wrote: »
    Im leaving ESO as soon as BDO launches - followed up by CU. I was hoping the patch would bring back PVP to life...

    See you in CU then!
    Susano'o

    Zerg Squad
  • ToRelax
    ToRelax
    ✭✭✭✭✭
    ✭✭
    Minno wrote: »
    No ETA. What happens if i had a client ask me "what's the ETA for those submittals?"
    In construction, submittals are documents used to solidify purchases on a project, according to our contract/design documents. Sometimes the person building the project or person supplying (distributor) holds on to these things for a month. Guess what, client still expects them to be signed off and reviewed according to the schedule/design all the trades aggreed to.
    Guess what else? You get that client his stuff that day so he is set in his mind your the man/woman that gets things done. That's how you protect good client business relationships.

    Sample of a construction schedule:
    fast-easy-accounting-bookkeeping-services-ms-project-gantt-chart-example.png?t=1452713886224&width=570&height=300
    Miss any of these deadlines and it costs the client money. If there's a problem, you have a week to solve it unless it's decided as an addendum (which costs money).

    Guess how you look good solving these things but need cushion room? Tell us it will be ready for next update, but solve it in a week and issue it.

    ZOS needs to up their post-release game if it wants to keep making MMO games.

    Idk... a MMO is a continual development process. So to me this just translates into not telling us of their long term plans.
    DAGON - ALTADOON - CHIM - GHARTOK
    The Covenant is broken. The Enemy has won...

    Elo'dryel - Sorc - AR 50 - Hopesfire - EP EU
  • Minno
    Minno
    ✭✭✭✭✭
    ✭✭✭✭✭
    ToRelax wrote: »
    Minno wrote: »
    No ETA. What happens if i had a client ask me "what's the ETA for those submittals?"
    In construction, submittals are documents used to solidify purchases on a project, according to our contract/design documents. Sometimes the person building the project or person supplying (distributor) holds on to these things for a month. Guess what, client still expects them to be signed off and reviewed according to the schedule/design all the trades aggreed to.
    Guess what else? You get that client his stuff that day so he is set in his mind your the man/woman that gets things done. That's how you protect good client business relationships.

    Sample of a construction schedule:
    fast-easy-accounting-bookkeeping-services-ms-project-gantt-chart-example.png?t=1452713886224&width=570&height=300
    Miss any of these deadlines and it costs the client money. If there's a problem, you have a week to solve it unless it's decided as an addendum (which costs money).

    Guess how you look good solving these things but need cushion room? Tell us it will be ready for next update, but solve it in a week and issue it.

    ZOS needs to up their post-release game if it wants to keep making MMO games.

    Idk... a MMO is a continual development process. So to me this just translates into not telling us of their long term plans.

    Yea it is continual and never really a final product. But the production timeline is the same with a viable end point (where players can play game):
    1) product conceptualized
    2) product in schematic
    3) product under construction
    4) finishing touches/ patches.

    The process doesn't go past those 4 points.

    Here's where ZOS might be running into trouble:

    - time spent in each phase us blurred. Right now they should be in simple patch phase and starting to switch into concept for new content. Instead they are heavily invested in construction phase (server code issues, missing planned content, IC missing original core pvp mechanic, etc.)
    - during this phase blur, they are not keeping up with player base requirements properly. I.E. class balance and server lag.
    - new content takes a hit, because time is spent on making the design a reality.

    So yea, ZOS fails on their commitment on sharing long term goals. But they are failing basic productivity guidelines (which my original comment was about) all because they released the design too early.

    Minno - DC - Forum-plar Extraordinaire
    - Guild-lead for MV
    - Filthy Casual
  • Sixthly
    Sixthly
    I am sure ETAs will be announced as they are available; there is no reason for ZeniMax to withhold this information unless it is still subject to change.
    Edited by Sixthly on January 18, 2016 5:35AM
  • zyk
    zyk
    ✭✭✭✭✭
    ✭✭✭✭✭
    The plan is to milk PVP players for as long as they can while building a better game for Skyrim noobs.
Sign In or Register to comment.